基于小波变换的GM(1,1)-ARMA组合预测模型对悬索管桥的应变预测

展开
  • 北京交通大学机械与电子控制工程学院, 北京 100044

收稿日期: 2015-03-07

  修回日期: 2015-05-26

  网络出版日期: 2016-01-30

基金资助

国家科技支撑计划重点项目基金(No.2011BAK06B01)资助

Prediction of Suspension Pipeline Strain by GM(1,1)-ARMA Model Based on Wavelet Transform

Expand
  • School of Mechanical, Electronic and Control Engineering, Beijing Jiaotong University, Beijing 100044, China

Received date: 2015-03-07

  Revised date: 2015-05-26

  Online published: 2016-01-30

摘要

ARMA模型采用差分处理对桥梁监测数据进行预测时,会出现数据丢失和预测精度降低的现象.为此,利用小波变换对信号进行离散化处理信息不会丢失的优点,将趋势明显的原始序列离散化,得到不同频带上的块信号.采用灰色GM(1,1)模型对趋势明显的低频信号进行趋势预测,用ARMA模型对平稳的高频细节信号进行细节预测,再将两部分预测值叠加得到最终预测值.对黄河悬索管桥在线监测系统获得的过去一段时间的应变数据进行验证,结果表明所提出的GM(1,1)-ARMA组合模型预测效果明显高于传统ARMA模型,这对实现同类桥梁的预警具有积极意义.

本文引用格式

郇滢, 兰惠清, 林楠, 张平 . 基于小波变换的GM(1,1)-ARMA组合预测模型对悬索管桥的应变预测[J]. 应用科学学报, 2016 , 34(1) : 95 -105 . DOI: 10.3969/j.issn.0255-8297.2016.01.011

Abstract

When using an ARMA model to predict monitoring data of bridges, difference processing causes some data lose. To improve prediction accuracy, this paper makes use of the advantages of wavelet analysis, i.e., no information is lost after wavelet transform. The time series with a clear trend are divided into two parts. The low-frequency part representing strain trend is modeled using GM(1,1), and the high-frequency part representing random disturbance using ARMA. The predicted value is then obtained by combining the two parts. Validation is made with the strain data acquired from an on-line monitoring system on a Yellow River suspension bridge. The results show that prediction accuracy of the combined GM(1,1)-ARMA model is higher than the traditional ARMA. The method is applicable to early warning of similar bridges.

参考文献

[1] Carden E P, Brownohn J M W. ARMA modeled time-series classification for structural health monitoring of civil infrastructure[J]. Mechanical Systems and Signal Processing, 2008, 22:295-314.

[2] 孙璐,王原,顾文钧. 浅埋黄土地区隧道健康监测之结构变形的时间序列预测模型[J]. 交通运输工程与信息学报,2012, 4:1-7. Sun L, Wang Y, Gu W J. Structural health monitoring and deformation prediction model of highway tunnel in loess area using tine series analysis[J]. Journal of Transportation Engineering and Information, 2012, 4:1-7. (in Chinese)

[3] Wang G X, Ding Y L. Mathematical modeling for lateral displacement induced by wind velocity using monitoring data obtained from main girder of Sutong cable-stayed bridge[J]. Mathematical Problems in Engineering, 2014, 3:23-52.

[4] 赵卓.基于ARMA模型的伊通河桥监测数据建模与可靠度分析[D].哈尔滨:哈尔滨工业大学,2012.

[5] 吴娇媚,韩雪. 基于时间序列的桥梁健康监测信息分析[J]. 西部交通科技,2010, 9:79-83. Wu J M, Han X. Data analysis regarding bridge health based on time sequence[J]. Western China Communications Science & Technology, 2010, 9:79-83. (in Chinese)

[6] 卫文哲,陈彦江,闫维明. 基于ARMA模型的桥梁施工监控时间序列分析[J]. 测绘科学,2011, 11:46-48. Wei W Z, Chen Y J, Yan W M. Time series analysis of bridge construction monitoring based on ARMA model[J]. Industrial Construction, 2011, 11:46-48. (in Chinese)

[7] 韩路跃,杜行检. 基于MATLAB的时间序列建模与预测[J]. 计算机仿真,2005, 22(4):105-107. Han L Y, Du X J. Modeling and prediction of time series based on MATLAB[J]. Computer simulation, 2005, 22(4):105-107. (in Chinese)

[8] Ives A, Abbott K C, Ziebarth N L. Analysis of ecological time series with ARMA(p,q) model[J]. Ecology, 2010, 91(3):858-871.

[9] Granger CWJ, Joyeux R. An Introduction to long memory time series models and fractional differencing[J]. Journal of Time Series Analysis, 1980, 11(3):27-43.

[10] 崔建国,赵云龙,董世良,张红梅,陈希成. 基于遗传算法和ARMA模型的航空发电机寿命预测[J]. 航空学报,2011, 8:1506-1511. Cui J G, Zhao Y L, Dong S L, Zhang H M, Chen X C. Life prognostics for aero-generator based on genetic algorithm and ARMA model[J]. Acta Aeronauticet Astronautica Sinica, 2011, 8:1506-1511. (in Chinese)

[11] Mohammadi K, Eslami H R, Kahawita R. Parameter estimation of an ARMA model for forecasting using goal programming[J]. Journal of Hydrology, 2006, 331(1/2):293-299.

[12] 史雪荣,王作蕾,张正娣. 变参数非等间距GM(1-1)模型及应用[J]. 数学的实践与认识,2006, 23:39-46. Shi X R, Wang Z L, Zhang Z D. GM(1,1) model with variational parameter for nonequidistant sequence and its application[J]. Mathematics in Practice and Theory, 2006, 23:39-46. (in Chinese)

[13] 赵建忠,徐廷学,李海军,叶文. 基于小波分析的导弹装备备件需求组合预测[J]. 电子学报,2014, 3:417-423. Zhao J Z, Xu T X, Li H J, Ye W. Combination forecasting of missile equipment spare demand based on wavelet analysis[J]. Acta Electronica Sinica, 2014, 3:417-423. (in Chinese)
文章导航

/